Capability · Epcotec

Networks designed, secured and observable.

Network design, routing and switching, SD-WAN, VPN and WireGuard meshes, Wi-Fi surveys and observability for offices, remote sites and multi-region fleets. Delivered by named senior engineers, fixed scope, staging from week one.

Book a scope review →All capabilities
What we deliver

The connectivity scope.

Network design and documentation

Addressing plans, routing design, failover behaviour and capacity envelopes written down before deployment, so the network outlives the people who built it.

Routing, switching and SD-WAN

Core and edge routing, VLAN and segmentation design, SD-WAN policy for multi-site traffic, and internet breakouts engineered for the applications that actually run on them.

VPN and WireGuard meshes

Site-to-site and remote-access connectivity on WireGuard and IPsec, with least-privilege routes, key rotation and the encrypted administrative paths our own operations depend on.

Wi-Fi surveys and coverage design

Coverage and interference surveys for offices, warehouses and industrial sites, with placement, channel plans and validation measured on site rather than estimated.

Observability and operations

Monitoring, alerting and flow visibility wired in at delivery: capacity trends, failure detection and the dashboards that turn a network from folklore into data.

Remote-site connectivity

Connectivity for places ordinary networks do not reach: hybrid links across cellular, low-earth-orbit satellite and terrestrial paths, with link budgets calculated before hardware ships.

Rough time estimate

Window: 2-6 weeks typical; multi-site programmes longer

Team: 1-2 network engineers + platform support

Complexity: M


Indicative only. A fixed price follows a free scope review.

Get a fixed quote
Delivery process

Design, cut-over, observability.

Traffic and failure model

We start with what the network must carry and how it may fail: applications, sites, choke points and the outages that hurt.

Design before hardware

Designs are documented and reviewed, addressing, routing, failover and security zones, before any device is ordered.

Staged cut-over

Changes land in stages with rollback defined in advance, so production traffic is never the experiment.

Observability at handover

Every delivery ends with a working cable plan plus monitoring, alerts and a documented operating model.

Benchmark deliveries

Proven on our own estate.

Operated on our own estate

The same practice runs the encrypted administrative paths, multi-region voice estate and monitoring behind our own production systems.

Documented by default

Designs, addressing plans and operating runbooks are deliverables, so clients own the network.

Rollback-first changes

Cut-overs are staged with the return path written before the change window opens.

More evidence in the delivery history and the complete 756-engagement register.

FAQ

Asked before the first site visit.

Do you sell equipment or deliver projects?

We deliver engineering engagements. We specify, configure and hand over networks, and we work with your vendors of choice. Equipment procurement stays with the client or their supplier.

Can you take over an existing network?

Yes. Engagements typically start with an audit: topology as-built, addressing, single points of failure and security posture, then a prioritised remediation plan.

What about remote or regional sites?

That is core practice. Hybrid links across cellular, low-earth-orbit satellite and terrestrial paths are designed from link budgets, with store-and-forward behaviour defined for the hours a link is down.

Do you handle structured cabling?

Physical cable installation is contracted to specialist installers. We specify, supervise and validate the result, and own everything above the patch panel.

Talk to the engineers.

You talk to the engineers doing the work.

Book a scope review →