2017: 61 engagements.
In 2017 Epcotec delivered 61 engagements across Hume corridor, inland and coastal NSW, ACT. Every engagement is recorded below - sector, work delivered and how it was achieved. No client names, by policy; references are available on request. The full 734-engagement register lives on one page here.
Sixty-one deliveries around the Hume Highway and the municipal belt south and west of Sydney, including the small cities of Bowral, Berrima, Shellharbour, Kiama and Wollongong. The ICT layer from 2016 now ships inside engineering deliverables: condition data arrives structured, versioned and ready for the client's systems.
2017 · 61 of 734 engagements recordedHume Highway programme corridor survey between interchanges, capturing geometry, drainage assets and clearances for duplication staging.
Mobile lidar collected the full corridor without traffic control, replacing closure crews and hand-run cross sections.
Delivered by Epcotec Pty Ltd, Canberra
Sealed road network condition survey across suburban grids, rating roughness and surface defects for reseal programming.
Vehicle-mounted profiler pushed results to a cloud asset portal, ending paper ratings collected ward by ward.
Delivered by Epcotec Pty Ltd, Canberra
Service desk telephony extension adding interactive voice menus and callback queues for the civic counter.
Cloud contact platform configured in the browser replaced hand-coded switch prompts and after-hours tape greetings.
Delivered by Epcotec Pty Ltd, Canberra
Levee condition review along the river frontage, mapping crest levels and seepage indicators for upgrade priorities.
Drone lidar swept the full alignment in one flight, superseding pegged cross sections at hundred-metre intervals.
Delivered by Epcotec Pty Ltd, Canberra
Heritage facade crack investigation for the gallery building, plotting crack widths and movement joints across elevations.
Photogrammetry from drone orbits built scaled elevation models, replacing scaffold towers and chalk measurement squares.
Delivered by Epcotec Pty Ltd, Canberra
Detailed setout and level control for the sporting precinct earthworks, issued directly to machine guidance files.
Design models streamed to grade-control systems, ending peg-and-string marking and nightly re-survey of stripped pads.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme bridge approach survey north of the crossing, documenting vertical clearances and guardrail geometry.
Scanning total stations logged structures in one setup, replacing ladder access and hand-plumbed clearance checks.
Delivered by Epcotec Pty Ltd, Canberra
Street tree inventory for the avenue network, recording species, size and structural defects against risk criteria.
Tablet surveys with offline sync and photo capture replaced printed tree registers and desk-based retyping.
Delivered by Epcotec Pty Ltd, Canberra
Overland flow path study through the floodplain suburb, defining escape routes and depths for planning controls.
GPU-accelerated flood modelling delivered scenarios overnight, replacing week-long runs and hand-digitised contour inputs.
Delivered by Epcotec Pty Ltd, Canberra
Depot network refresh extending wifi to workshop bays, stores and yard gantries for mobile job cards.
Heatmap-driven access point placement replaced trial-and-error boosters and the cable runs taped across doorways.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme pavement investigation on the bypass approaches, coring and testing for reconstruction designs.
Ground penetrating radar mapped layer thicknesses continuously, superseding random cores and interpolated design sections.
Delivered by Epcotec Pty Ltd, Canberra
Community facility condition assessment covering halls, libraries and amenities, scoring elements for the capital budget.
Standardised tablet audits synced to the register overnight, ending typed facility reports circulated by post.
Delivered by Epcotec Pty Ltd, Canberra
Timber bridge girder inspection across creek crossings, mapping decay zones and load ratings for strengthening works.
Moisture mapping logged on field devices fed a cloud dashboard, replacing hand-ruled inspection pro formas.
Delivered by Epcotec Pty Ltd, Canberra
Irrigation district drainage review quantifying tailwater returns and salinity loads for the reuse scheme business case.
Telemetry from channel loggers streamed to dashboards, ending monthly reading rounds and ledger-ruled flow books.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme interchange capacity study modelling ramp performance and merge gaps under staged growth.
Simulation built from detector and probe data replaced count-board surveys and hand-timed headway sheets.
Delivered by Epcotec Pty Ltd, Canberra
Stormwater network inspection program across the town grid, grading pipes, pits and inlets for renewal lists.
CCTV crawler footage indexed in the cloud replaced torch-and-mirror checks and handwritten pit logs.
Delivered by Epcotec Pty Ltd, Canberra
Control network densification for the light rail stage, establishing survey marks and datum ties along the route.
GNSS adjustment in the cloud distributed coordinates instantly, superseding trig travels and hand-copied bearing books.
Delivered by Epcotec Pty Ltd, Canberra
Works depot VoIP extension connecting sheds and weighbridge to the depot exchange with paging groups.
PoE handsets on the existing network retired dedicated copper pairs and the depot bell circuit.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme service centre access review, surveying queues, turning paths and signage sightlines at both entries.
Drone hover sequences tracked heavy vehicle paths, replacing observers on ladders and stopwatch gap sampling.
Delivered by Epcotec Pty Ltd, Canberra
Rural road and culvert inventory across the shire network, capturing flood damage history for restoration grants.
Offline field apps with photo evidence replaced paper traverse sheets and the duplicated typing backlog.
Delivered by Epcotec Pty Ltd, Canberra
Cherry festival precinct infrastructure audit covering lighting, power outlets and furniture ahead of the season peak.
Geo-tagged defect records uploaded live, ending laminated audit forms retyped back at the depot office.
Delivered by Epcotec Pty Ltd, Canberra
Ocean pool wall condition investigation, documenting reinforcement corrosion and spalling extents for remediation scoping.
Half-cell potential surveys logged digitally against tide windows, replacing hand-plotted readings on graph paper.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme ramp metering feasibility collecting lane utilisation and merge conflicts through the morning period.
Loop detector feeds pulled through an API replaced lane observers and hourly manual tally boards.
Delivered by Epcotec Pty Ltd, Canberra
Flood-affected road inventory update capturing damage extents and reinstatement scopes after the season's events.
Drone imagery mosaics referenced in the register ended ground-inspection repeats and sketch-damage plan annotations.
Delivered by Epcotec Pty Ltd, Canberra
Records digitisation program scanning plan sets and correspondence into the council document system with metadata.
Optical character recognition made archives searchable, retiring plan drawers and the signed-out register book.
Delivered by Epcotec Pty Ltd, Canberra
Topographic survey for the industrial estate extension, delivering contours, services and access geometry for design.
UAV photogrammetry with ground control produced the terrain model without extended field walking of every lot.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme noise wall alignment survey tying wall footings, services and driveways for staged construction.
Robotic total station plus machine guidance files superseded offset stakes and repeated line-marking visits.
Delivered by Epcotec Pty Ltd, Canberra
Public toilet and shelter asset audit across parks and reserves, rating structure, fittings and accessibility.
Fixed-form tablet checklists uploaded to the asset database each night, ending ring-bound audits and retyping.
Delivered by Epcotec Pty Ltd, Canberra
Town water main criticality assessment ranking failure consequence and likelihood for the renewal funding submission.
Break history imported from service systems into GIS replaced the card-file failure log in the storeroom.
Delivered by Epcotec Pty Ltd, Canberra
Field mobility rollout issuing rugged tablets to inspection crews with single sign-on to depot systems.
Mobile device management pushed apps centrally, ending shared clipboards, paper diaries and the sign-on kiosk.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme freight corridor data collection through the gateway route, capturing classifications and axle spectra.
Weigh-in-motion stations reported through nightly feeds, replacing portable scales and roadside interview sheets.
Delivered by Epcotec Pty Ltd, Canberra
Sports field drainage and surface audit across the ovals network, grading subsurface condition for upgrade works.
Infiltration testing logged on field tablets replaced guesswork ratings and the handwritten oval inspection book.
Delivered by Epcotec Pty Ltd, Canberra
Water tower condition investigation, mapping coating failures, pitting and weld defects for refurbishment specification.
Ultrasonic thickness gauges paired with drone visuals superseded climbing crews and chalk-marked defect panels.
Delivered by Epcotec Pty Ltd, Canberra
Flood study update for the tributary catchment, recalibrating design events against the recent record event.
Cloud-based hydraulic runs and automatic calibration replaced sequential solver batches run on desktop towers.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme signage audit along the bypass, checking legibility distances and mounting compliances at night.
Vehicle-mounted retroreflectivity measurements logged by GPS replaced ladder inspections and hand-held signage checks.
Delivered by Epcotec Pty Ltd, Canberra
Airport pavements and apron condition survey, grading slabs and markings for the aviation funding round.
Digital deliverables issued through the aviation portal ended paper plan sets and bound submission copies.
Delivered by Epcotec Pty Ltd, Canberra
Unified communications extension adding video conferencing rooms to the council chambers and two meeting spaces.
Cloud-hosted conferencing with calendar integration retired travel for deputations and the hired speakerphone kit.
Delivered by Epcotec Pty Ltd, Canberra
As-constructed survey of the sewer rising main route, capturing alignment and depth for the GIS handover.
Locator and inertial data merged into the asset model replaced as-laid sketches and depth probe records.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme heavy vehicle rest area review surveying capacity, turning geometry and amenity usage.
Automatic number plate timestamps measured dwell times, ending patrol-vehicle observations and manually kept occupancy sheets.
Delivered by Epcotec Pty Ltd, Canberra
Coastal walkway asset inventory from the blowhole to the headland, grading structures and surfacing condition.
Mobile app records with photo links replaced laminated route maps and the annual typed walkover summary.
Delivered by Epcotec Pty Ltd, Canberra
Macquarie riverbank erosion assessment mapping scour zones and vegetation cover for stabilisation staging.
Drone orthophotos compared year to year in the cloud, superseding boat-based photo runs and field sketches.
Delivered by Epcotec Pty Ltd, Canberra
Retaining wall condition investigation along the cutting reserve, assessing batter movement and drainage behind panels.
Inclinometer telemetry streamed to the dashboard replaced periodic manual probe readings between site visits.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme environmental culvert survey assessing aquatic passage and scour at the crossing structures.
Drone orthoimagery and 3D culvert scans superseded wading inspections and hand-measured opening dimensions.
Delivered by Epcotec Pty Ltd, Canberra
Street lighting inventory across the suburban grid recording pole type, condition and energy ratings for replacement.
Barcode-tagged poles synced to the lighting register ended ledger books and yearly lamp-count rounds.
Delivered by Epcotec Pty Ltd, Canberra
Backup resilience upgrade moving depot file shares and survey archives onto replicated cloud storage tiers.
Versioned cloud snapshots and integrity checks replaced quarterly tape swaps and the offsite vault courier.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme approach road survey south of the bypass tie-in, documenting geometry and pavement edges.
Mobile mapping van collected absolute trajectory data in one pass, replacing staged closures for profiling.
Delivered by Epcotec Pty Ltd, Canberra
Link road corridor study connecting the industrial estate to the highway, assessing alignment options and access.
Drone photogrammetry delivered candidate route models in days, superseding walkover route selection and hand contours.
Delivered by Epcotec Pty Ltd, Canberra
Cemetery and reserve asset register covering headstone zones, irrigation and access paths for works scheduling.
Map-linked register entries on tablets replaced the leather-bound plot ledger and annual card re-indexing.
Delivered by Epcotec Pty Ltd, Canberra
Irrigation channel seepage assessment identifying loss hotspots and lining priorities along the delivery network.
Flow balance computed from telemetry stations replaced daily weir reading rounds and pencil-ruled gauge books.
Delivered by Epcotec Pty Ltd, Canberra
Grain silo structure inspection verifying wall thinning, bolt corrosion and foundation movement for continued certification.
Drone imagery and ultrasonic logging compiled digitally, superseding scaffold access and paper thickness records.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme interchange lighting review measuring illuminance and glare across ramps through the night period.
Calibrated lux loggers geotagged readings automatically, ending manual meter walks and hand-ruled measurement grids.
Delivered by Epcotec Pty Ltd, Canberra
CBD footpath and street furniture audit grading trip hazards, clearances and furniture defects for renewal plans.
Tablet capture with automatic defect coding replaced paper audit sheets and weeks of office transcription.
Delivered by Epcotec Pty Ltd, Canberra
Depot switchboard replacement consolidating telephony, security and building systems onto the converged network core.
Software-defined configuration through the cloud console retired per-device site visits and the punch-down patch frame.
Delivered by Epcotec Pty Ltd, Canberra
GIS server migration moving council mapping services onto cloud-hosted infrastructure with published data feeds.
REST endpoints replaced mailed shapefile disks and the weekly extraction copied onto USB sticks.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme median safety barrier survey documenting post spacing, end terminals and drainage conflicts.
Vehicle-mounted lidar measured offsets from moving lanes, replacing lane closures and crews working behind cones.
Delivered by Epcotec Pty Ltd, Canberra
Street tree canopy and root zone audit along the boulevard network, scoring conflicts with footpaths.
Canopy cover derived from drone flights plus field validation superseded estimating from printed aerial sheets.
Delivered by Epcotec Pty Ltd, Canberra
Coastal lagoon entrance shoaling study tracking sandbar movement and flood risk for opening decision protocols.
Repeated drone surveys and automated volume differencing replaced survey boat soundings between opening events.
Delivered by Epcotec Pty Ltd, Canberra
Regional office telephony consolidation moving three branch exchanges onto one cloud-hosted platform with shared directories.
Number porting and softphone clients ended the cascade of copper lines and per-branch maintenance contracts.
Delivered by Epcotec Pty Ltd, Canberra
Hume Highway programme smart motorway data trial streaming detector, camera and probe feeds for incident analytics.
Cloud streaming pipeline ingested live feeds continuously, replacing weekly compiled spreadsheets and couriered data disks.
Delivered by Epcotec Pty Ltd, Canberra
Hillside stairway and walkway inventory across the escarpment suburbs, grading structures and lighting for access audits.
Offline mapping capture in the field synced to the central register, replacing marked-up printouts.
Delivered by Epcotec Pty Ltd, Canberra
Stormwater outlet and scour assessment along the cliffs, prioritising headwall repairs and energy dissipator works.
Drone captures of inaccessible outfalls replaced rope-access visits and hand-sketching of scour extents.
Delivered by Epcotec Pty Ltd, Canberra